粉嫩av-欧美老熟妇又粗又大-亚洲欧美天堂-91精品久久久久久久-日本少妇一区二区-成人在线黄色-伊人青草-奇米成人影视-国产亚洲精品熟女国产成人-天天草天天操-天天射干-四虎国产精品永久在线国在线-欧美日韩在线播放三区四区-亚洲人在线视频-喷潮在线

Current Location:Home > Product > High frequency induction heating series > High frequency heating machine

2019-10-12 14:05:09

Share
  • Share to WeChat Moments

RAC-120KW high frequency heating machine

  • Description

1. Main application

 1. Application of ribbed induction annealing production line;

 2. Heating and burning through the hot upsetting production line of round steel bar and steel column;

 3. Induction heating of square steel;

 4. The diathermy of the whole iron rod;

 5. Red forging of standard parts (nuts and bolts);

 6. Partial through-fire forging forming of pipes;

 7. Hot forging of cold-drawn solid section steel, hot upsetting of the tie head of cold-drawn seamless steel pipe;

 8. Induction hot upsetting of drill pipe ends;

 9. Heating forging of automobile maintenance tools (socket wrenches);

 10. Heating, stamping and bending of high-voltage power transmission and power line tower angle steel plates;

 11. On-line warm upsetting forging of copper bars;

 12. The application of heating and warm upsetting in the hot upsetting production line of the automatic steel ball and steel column upsetting machine.

 13. Hot forging of rivets, spring bars and road studs for railway accessories

 14. Heating of supporting accessories such as circlips and U-shaped cables;

 15. Heating ears of leaf springs, etc.

 

2. Main Features

1. Using IGBT power devices and our company's second-generation converter control technology, the equipment has higher reliability and lower maintenance costs;

2. Full load continuous rate, 24 hours operation;

3. With constant current/constant power control function, the heating efficiency is higher;

4. Full display of output power, frequency and current;

5. The installation is simple, only need to connect electricity and water to use, no need to install by special personnel;

 

3. Installation method

1. Place the main and auxiliary machines: Generally, the main machine (operation control machine) is placed on the top, and the auxiliary machine (power output machine) is placed at the bottom.

2. Connect the water and electricity of the main and auxiliary machines: Use the two thin water pipes in the accessories to connect the waterway in a straight up and straight down way. Then use the two cables in the accessories, red to red and black to black to connect the circuit. It must be tightened, and there should be no poor contact. Connect the ground wire of the main and auxiliary machines.

3. Power connection: This machine is a three-phase power supply mode (380V), and the three red wires are respectively connected to a special three-phase switch or air switch (above 65A). Reconnect the ground wire.

4. Water connection: The cooling water pressure used by this machine is 0.1Mpa-0.3Mpa. Please choose a 1.1KW water pump and a water tank or pool (the water pump should be selected according to the length of the distance, and the larger water pump should be selected for the long distance; the volume should be selected according to the continuous working time and workload, and a small cooling tower can be installed if necessary). The water outlet of the pump is connected to the water inlet of the machine with a water pipe, and the water outlet of the machine returns the return water to the pool with a water pipe to realize water circulation cooling.

5) Install the induction coil: According to the shape and size of the heated metal workpiece, select, install and fix the induction coil. Note that the induction coil cannot be short-circuited.

6. Putting the workpiece: Put the workpiece to be heated into the center of the induction coil, the surrounding gap should be basically the same, and the workpiece and the induction coil should not touch.

 

4. Operation steps

1. Water: Start the water pump and observe whether the water flow at the water outlet is normal.

2. Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3. Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4. Start: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5. Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6. Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7. Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch at the rear of the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!

 

5. Maintenance

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

 
6. Technical parameters

model

RAC-120KW

Output Power

120KW

Input voltage

380v 50hz

Oscillation frequency

10-30khz

Pump Specifications

2.2kw

Cooling tower water flow

15T/Hour

pool

2cube

transformer

50KW

copper wire

50square

 

Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 日本特级黄色 | 日本精品视频一区二区三区 | 伊人网av | 欧美色999| 午夜激情视频网站 | 欧美aaa大片 | 在线成人欧美 | 91网址在线| 日本一区二区三区免费在线观看 | 双性人妖互交localhost | 色欲一区二区三区精品a片 美日韩av在线 | 在线免费看污视频 | 极品尤物一区二区 | 久久视频一区 | 亚洲区一区二区三区 | 亚洲一区二区av | 亚洲最大av在线 | 亚洲毛片精品 | 香蕉视频黄污 | 亚洲草逼视频 | 国产精品老女人 | h视频国产 | 久久大奶| 伊人98 | 先锋影音一区二区 | 国产午夜精品理论片 | 国产一区二区精品 | 91打屁股| 国产精品视频导航 | 国产稀缺真实呦乱在线 | 激情欧美一区 | 国产区一二三 | 91 免费看片 | 天堂成人 | 男人操女人的网站 | 成人乱码一区二区三区av | 色吧在线观看 | 国产污视频网站 | 欧美射| 成人福利视频在线观看 | 欧美大片免费在线观看 | 欧美第三页 | www.国产麻豆| 亚洲美女视频网站 | 男女日批免费视频 | 国产馆av| 777黄色| 黄色变态网站 | 人妻视频一区二区三区 | 久久性av | 不卡av一区二区 | 婷婷丁香亚洲 | 91区| 一级成人毛片 | 综合成人在线 | 精品国模一区二区三区欧美 | 亚洲黄色网址大全 | 精品国产亚洲AV | 99热视| 深夜福利免费在线观看 | 欧美呦交| 浪浪视频在线观看 | 免费黄色的网站 | 日韩一区二区三区四区五区六区 | 亚洲女人网 | 中文字幕在线免费观看 | 涩涩网站入口 | 国产第6页| 毛片在线免费观看视频 | 免费视频精品 | 亚洲毛片在线看 | 少妇aaaa | 亚洲精品一区二区三区不卡 | 日本中文字幕网 | 亚洲经典av| 日韩一区二区免费看 | 九草网| 日本在线免费播放 | 人妻无码中文字幕免费视频蜜桃 | 成人高潮片免费视频 | 亚洲免费影视 | 性欧美69| 日韩精品一区二区亚洲av性色 | 97精品国产97久久久久久免费 | 男女扒开双腿猛进入爽爽免费 | 牛牛精品一区二区 | 国产精品视频一二三区 | 欧美在线免费播放 | 国产精品一二三区在线观看 | 亚洲网在线观看 | 欧美在线播放一区二区 | www.超碰在线观看 | 日本老太婆做爰视频 | 午夜日韩在线 | 久久夜色网 | 欧美综合视频在线观看 | 美女av网站 | 91嫩草欧美久久久九九九 | 亚洲毛片一区 |