RAC-85KW high frequency heating machine

  • Description

1. Main application

 1. Application of ribbed induction annealing production line;

 2. Heating and burning through the hot upsetting production line of round steel bar and steel column;

 3. Induction heating of square steel;

 4. The diathermy of the whole iron rod;

 5. Red forging of standard parts (nuts and bolts);

 6. Partial through-fire forging forming of pipes;

 7. Hot forging of cold-drawn solid section steel, hot upsetting of the tie head of cold-drawn seamless steel pipe;

 8. Induction hot upsetting of drill pipe ends;

 9. Heating forging of automobile maintenance tools (socket wrenches);

 10. Heating, stamping and bending of high-voltage power transmission and power line tower angle steel plates;

 11. On-line warm upsetting forging of copper bars;

 12. The application of heating and warm upsetting in the hot upsetting production line of the automatic steel ball and steel column upsetting machine.

 13. Hot forging of rivets, spring bars and road studs for railway accessories

 14. Heating of supporting accessories such as circlips and U-shaped cables;

 15. Heating ears of leaf springs, etc.

 

2. Main Features

1. Using IGBT power devices and our company's second-generation converter control technology, the equipment has higher reliability and lower maintenance costs;

2. Full load continuous rate, 24 hours operation;

3. With constant current/constant power control function, the heating efficiency is higher;

4. Full display of output power, frequency and current;

5. The installation is simple, only need to connect electricity and water to use, no need to install by special personnel;

 

3. Installation method

1. Place the main and auxiliary machines: Generally, the main machine (operation control machine) is placed on the top, and the auxiliary machine (power output machine) is placed at the bottom.

2. Connect the water and electricity of the main and auxiliary machines: Use the two thin water pipes in the accessories to connect the waterway in a straight up and straight down way. Then use the two cables in the accessories, red to red and black to black to connect the circuit. It must be tightened, and there should be no poor contact. Connect the ground wire of the main and auxiliary machines.

3. Power connection: This machine is a three-phase power supply mode (380V), and the three red wires are respectively connected to a special three-phase switch or air switch (above 65A). Reconnect the ground wire.

4. Water connection: The cooling water pressure used by this machine is 0.1Mpa-0.3Mpa. Please choose a 1.1KW water pump and a water tank or pool (the water pump should be selected according to the length of the distance, and the larger water pump should be selected for the long distance; the volume should be selected according to the continuous working time and workload, and a small cooling tower can be installed if necessary). The water outlet of the pump is connected to the water inlet of the machine with a water pipe, and the water outlet of the machine returns the return water to the pool with a water pipe to realize water circulation cooling.

5) Install the induction coil: According to the shape and size of the heated metal workpiece, select, install and fix the induction coil. Note that the induction coil cannot be short-circuited.

6. Putting the workpiece: Put the workpiece to be heated into the center of the induction coil, the surrounding gap should be basically the same, and the workpiece and the induction coil should not touch.

 

4. Operation steps

1. Water: Start the water pump and observe whether the water flow at the water outlet is normal.

2. Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3. Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4. Start: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5. Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6. Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7. Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch at the rear of the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!

 

5. Maintenance

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

 
6. Technical parameters

model

RAC-85KW

Output Power

120KW

Input voltage

380v 50hz

Oscillation frequency

10-30khz

Pump Specifications

2.2kw

Cooling tower water flow

15T/Hour

pool

2cube

transformer

50KW

copper wire

50square

 

Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 欧美黄色大片在线观看 | 久草久热 | 久久精品视频观看 | 美女无遮挡免费网站 | 精品少妇3p | 日韩有码第一页 | 无码人妻一区二区三区在线视频 | 少妇人妻邻居 | 极品白嫩的小少妇 | 强开小嫩苞一区二区三区网站 | 国产免费无码XXXXX视频 | 精品国产一区二区三区久久久久久 | 激情偷乱人成视频在线观看 | 污视频在线观看免费 | 久久久久久久久久久久久女国产乱 | 一区二区欧美在线 | 天堂8中文| 免费观看av | 少妇又色又紧又黄又刺激免费 | 综合久久亚洲 | 日韩电影在线观看中文字幕 | 999在线视频 | 美女极度色诱图片www视频 | 中文字幕蜜桃 | 亚洲制服无码 | 下面一进一出好爽视频 | 精品人妻一区二区三区三区四区 | 日韩成人免费观看 | 涩涩成人网 | 精产国品一二三产区m553麻豆 | 色婷婷精品国产一区二区三区 | 国产精品一区不卡 | 性少妇videosexfreexxx片 | 人人干在线 | 夜色网 | 快色网站 | 午夜剧场免费观看 | 欧美亚洲精品在线 | 日韩一级中文字幕 | 男人天堂avav| 女人16一毛片 | 国产精品久久久久久 | 亚洲在线电影 | 成人国产精品一区二区 | 三级理伦 | 国产成人精品一区二区三区 | 怡红院男人的天堂 | 性欧美在线观看 | 国产色啪 | 天天草影院| 无码人妻aⅴ一区二区三区 成人亚洲视频 | 重囗另类bbwseⅹhd | av白浆| 国产精品成熟老女人 | 狠狠操婷婷 | 久久久国际精品 | 免费的理伦片在线播放 | av网址在线看 | 在线天堂网 | 中文字幕精品久久 | 99热在线播放 | 黄色.com | 天天干狠狠 | 精品一区不卡 | 国产欧美日韩久久 | 夜夜春影院 | 日本高潮视频 | yy6080久久 | 日本aⅴ视频 | 欧美多人猛交狂配 | 欧美乱妇日本无乱码特黄大片 | 强开乳罩摸双乳吃奶羞羞www | 99热精品免费| 久久成人免费网站 | 欧美大片一区二区三区 | 久久久人妻无码一区二区 | 黄色美女一级片 | 老司机深夜福利网站 | 男人操女人视频网站 | 日韩人妻精品中文字幕 | 欧美三级日本三级 | 三级不卡 | 丰满多毛的大隂户视频 | 歪歪6080 | 亚洲国产免费视频 | 草久久久久 | 欧美一级三级 | 国产视频一区二 | 精品国产精品网麻豆系列 | 亚洲另类欧美日韩 | 东京久久久 | 免费成人深夜在线观看 | 久草加勒比 | 久久精品无码一区二区三区毛片 | 手机看片福利在线 | 自拍偷拍亚洲精品 | 18av在线播放 | 亚洲偷怕| 久久久久久无码精品大片 |