粉嫩av-欧美老熟妇又粗又大-亚洲欧美天堂-91精品久久久久久久-日本少妇一区二区-成人在线黄色-伊人青草-奇米成人影视-国产亚洲精品熟女国产成人-天天草天天操-天天射干-四虎国产精品永久在线国在线-欧美日韩在线播放三区四区-亚洲人在线视频-喷潮在线

Current Location:Home > Product > High frequency induction heating series > High frequency heating machine

2019-10-12 13:38:26

Share
  • Share to WeChat Moments

RAC-40kw high frequency heating machine

  • Description

1. Main application

 1. Application of ribbed induction annealing production line;

 2. Heating and burning through the hot upsetting production line of round steel bar and steel column;

 3. Induction heating of square steel;

 4. The diathermy of the whole iron rod;

 5. Red forging of standard parts (nuts and bolts);

 6. Partial through-fire forging forming of pipes;

 7. Hot forging of cold-drawn solid section steel, hot upsetting of the tie head of cold-drawn seamless steel pipe;

 8. Induction hot upsetting of drill pipe ends;

 9. Heating forging of automobile maintenance tools (socket wrenches);

 10. Heating, stamping and bending of high-voltage power transmission and power line tower angle steel plates;

 11. On-line warm upsetting forging of copper bars;

 12. The application of heating and warm upsetting in the hot upsetting production line of the automatic steel ball and steel column upsetting machine.

 13. Hot forging of rivets, spring bars and road studs for railway accessories

 14. Heating of supporting accessories such as circlips and U-shaped cables;

 15. Heating ears of leaf springs, etc.

 

2. Main Features

1. Using IGBT power devices and our company's second-generation converter control technology, the equipment has higher reliability and lower maintenance costs;

2. Full load continuous rate, 24 hours operation;

3. With constant current/constant power control function, the heating efficiency is higher;

4. Full display of output power, frequency and current;

5. The installation is simple, only need to connect electricity and water to use, no need to install by special personnel;

 

3. Installation method

1. Place the main and auxiliary machines: Generally, the main machine (operation control machine) is placed on the top, and the auxiliary machine (power output machine) is placed at the bottom.

2. Connect the water and electricity of the main and auxiliary machines: Use the two thin water pipes in the accessories to connect the waterway in a straight up and straight down way. Then use the two cables in the accessories, red to red and black to black to connect the circuit. It must be tightened, and there should be no poor contact. Connect the ground wire of the main and auxiliary machines.

3. Power connection: This machine is a three-phase power supply mode (380V), and the three red wires are respectively connected to a special three-phase switch or air switch (above 65A). Reconnect the ground wire.

4. Water connection: The cooling water pressure used by this machine is 0.1Mpa-0.3Mpa. Please choose a 1.1KW water pump and a water tank or pool (the water pump should be selected according to the length of the distance, and the larger water pump should be selected for the long distance; the volume should be selected according to the continuous working time and workload, and a small cooling tower can be installed if necessary). The water outlet of the pump is connected to the water inlet of the machine with a water pipe, and the water outlet of the machine returns the return water to the pool with a water pipe to realize water circulation cooling.

5) Install the induction coil: According to the shape and size of the heated metal workpiece, select, install and fix the induction coil. Note that the induction coil cannot be short-circuited.

6. Putting the workpiece: Put the workpiece to be heated into the center of the induction coil, the surrounding gap should be basically the same, and the workpiece and the induction coil should not touch.

 

4. Operation steps

1. Water: Start the water pump and observe whether the water flow at the water outlet is normal.

2. Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3. Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4. Start: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5. Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6. Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7. Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch at the rear of the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!

 

5. Maintenance

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

 

6. Technical parameters

 

model

RAC-40KW

Output Power

40KW

Input voltage

380v 50hz

Oscillation frequency

10-30khz

Pump Specifications

750w

Cooling tower water flow

10T/Hour

pool

1cube

transformer

50KW

copper wire

10square

 

Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 国产精品久久久久久久久借妻 | av网站免费观看 | 天堂网在线中文 | 婷婷综合激情网 | 香港黄色网 | xx视频在线观看 | 日日夜夜综合网 | 狠狠干天天干 | 日韩美女黄色片 | 亚洲天堂一区二区三区四区 | 爆操巨乳美女 | 免费观看黄色一级片 | 欧美网站在线观看 | 成人国产精品 | 欧美日韩一区不卡 | 日本成人在线不卡 | 日本高清视频www夜色资源 | 粗大挺进潘金莲身体在线播放 | 精品中文字幕一区二区 | 性欧美日韩 | 国产激情久久久久 | 九九在线观看高清免费 | a级免费观看 | www.色中色| 我要色综合网 | 我的丝袜美腿尤物麻麻 | 婷婷亚洲五月色综合 | 老熟女一区二区三区 | 天天射狠狠干 | 黄色片一级片 | 国产精品s| 日本一区二区视频在线 | 青青av在线 | 久色亚洲 | 日本一区二区三区免费看 | 黄色高清视频在线观看 | 成人看片在线 | 中文在线a√在线8 | 精品色哟哟 | 超级黄色录像 | 久久888 | 欧美国产一级片 | 成人毛片在线精品国产 | 夜夜草 | 91极品国产 | aaaa一级片 | 国产a不卡 | 日韩草逼视频 | 香蕉一区二区 | 中日毛片| 国产精品免费看 | 欧美激情图 | 伊人精品综合 | 操碰人人| 国内成人在线 | 99久精品 | 国产原创91 | 少妇淫片| 欧美成人精品激情在线观看 | 欧美综合区| 久久精品国产熟女亚洲AV麻豆 | 亚洲一区精品视频 | 日韩二区在线观看 | 豆花在线视频 | wwwav在线播放 | 无码人妻精品一区二区三区9厂 | 欧美国产在线观看 | 未满十八岁勿进 | 日本a级c片免费看三区 | 成人性生生活性生交全黄 | 精品欧美在线 | 亚洲品质自拍视频 | 成人亚洲 | 五月综合久久 | 国产精品麻豆一区 | 黑人专干日本人xxxx | 国产草草影院ccyycom | 91网在线| 精品一区在线观看视频 | 国产精品亚洲第一 | 韩国三级hd两男一女 | 亚洲日批| 精品一区久久 | 福利视频午夜 | 亚洲国产日韩av | 欧美在线免费 | 日韩欧美xxx | 99嫩草| 欧美黄色免费视频 | 亚洲欧美成人网 | 天天夜夜久久 | 久久久久久草 | 自拍偷拍 亚洲 | 岛国黄色片 | 神马影院一区二区 | 91视频免费网站 | 中国一及毛片 | 久久福利一区 | 国产精品视频a |