粉嫩av-欧美老熟妇又粗又大-亚洲欧美天堂-91精品久久久久久久-日本少妇一区二区-成人在线黄色-伊人青草-奇米成人影视-国产亚洲精品熟女国产成人-天天草天天操-天天射干-四虎国产精品永久在线国在线-欧美日韩在线播放三区四区-亚洲人在线视频-喷潮在线

Current Location:Home > Product > IF induction series > IF power supply

2018-10-26 10:13:27

Share
  • Share to WeChat Moments

RAZ-400KW intermediate frequency power supply---+---furnace shelf (combination)

  • Description

Induction Heating Power Supply--Safety Operation Guide


1. Before starting the machine, first check whether the water, gas and electricity are connected. After connecting, the following operations can be performed;

2. The operator must prepare corresponding insulating shoes, gloves, etc.

3. The operator must have the corresponding electrical knowledge.

4. Before the equipment is overhauled, the electric switch must be pulled off to confirm that the power supply is disconnected, and then the discharge treatment is carried out, and then the overhaul card is hung up, and the overhaul is repeated.

5. Before starting the machine, first make sure that the waterway is normal and all parts of the equipment are normal before starting the machine.

6. Turn on the first gear filament first, then turn on the second gear filament after five minutes, and then send the high voltage after another five minutes.

7. Before sending high voltage, make sure that the output adjustment potentiometer is in a small position, and then send high voltage, and adjust the output voltage to the working voltage.

8. After confirming that there is a workpiece, you can press the heating button to make the equipment work, but no-load heating is not allowed.

9. If there is an abnormality in the equipment during work, the power supply must be disconnected immediately, and the reason should be checked before working again.

10. After the equipment is finished working, first disconnect the heating, then disconnect the high voltage, then turn off the filament and disconnect the power supply.

11. After the equipment stops working, wait for five minutes before disconnecting the water source.

12. During the operation of the equipment, if there is a temporary need to leave, it must be done. People leave the machine and stop it. It is not allowed. The machine is still working when there is no one.


weekly maintenance

1. When taking over the shift, check the flow of the cooling water outlet pipe of the equipment for abnormal phenomena. For equipment that uses evaporative cooling tubes, it is necessary to check whether the water level of the distilled water tank is qualified;

2. When taking over, check whether the cooling air volume of the glass shell and core column of the electronic tube and other ventilation and heat dissipation facilities are normal;

3. Check whether the contacts of each AC contactor are ablated and whether the wiring is loose;

4. Measure the insulation resistance of cooling water. The ground resistance of the anode of the water-cooled tube should be greater than 300K ohms;

5. The cooling water pipes of the electronic tube grid and the filament are mostly rubber tubes, which are easy to age and should be carefully checked. For the rubber tube that is aging and about to break, it should be updated in time;

6. Do a cleaning and dust removal on the inside of the chassis, wipe off the dust of each high-pressure porcelain bottle and insulating pillars, and pay attention to the cleaning of the dust filter on the air inlet of the fan. Prevent the air intake from being blocked and reduce the air output.


Semi-annual maintenance

1. Check whether the insulation performance of the low-voltage electric control circuit is qualified;

2. Use a megohmmeter to detect the insulation resistance of high-voltage devices such as high-voltage rectifier transformers, high-voltage cables, and high-voltage silicon stacks, and the value should meet the requirements;

3. Check the roundness of the inner tube of the water jacket of the electronic tube and the height of the positioning protrusion, so as to prevent the partial overheating of the anode caused by the deviation of the tube. And check whether there is scaling at the water jacket outlet and inlet pipe joints, and whether the anti-corrosion electrode is normal; 4. Check the set current value of each overcurrent relay;

5. For connecting conductors with high temperature during operation, such as filament lead wires, soft connecting wires for welding transformer primary coils, etc., if there is poor oxidation contact, additional treatment should be made;

7. Thoroughly clean the hidden places such as the top of the cabinet and the cable trench.


Link to this article:http://m.mortgage-hk.com/en/product/product20181026142.html
Previous:NO!
Next:NO!

Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 在线视频99 | 中文字幕一区二区三区夫目前犯 | 黄色一极毛片 | 99精品中文字幕 | 蜜桃成人网 | 国产又粗又猛又爽又黄91 | 一个色av | 99视频在线播放 | 久草高清视频 | 四虎影视免费 | 五月深爱婷婷 | 精品国产91乱码一区二区三区 | av一级久久| 国内毛片毛片 | 欧美日韩综合 | 91精品国产闺蜜国产在线闺蜜 | 精品91久久久久久 | 国产精品欧美激情 | 欧美午夜理伦三级在线观看 | jizzjizzjizz亚洲| 欧美三级视频在线 | 免费中文字幕视频 | 精品视频91 | 国产欧美日韩精品一区二区三区 | 亚洲男人在线 | 91插插插插插 | 日韩福利电影在线观看 | 久久噜噜噜 | 国产精品一线二线三线 | 国产一区二区日韩 | 亚洲欧美在线观看 | 人人妻人人澡人人爽人人欧美一区 | 国产一区二区三区18 | 夜夜嗨av一区二区三区网页 | 日韩av在线直播 | 国产老妇伦国产熟女老妇视频 | 老头吃奶性行交 | 亚洲综合中文 | 超碰在线91 | 国产精品图片 | 久操视频在线免费观看 | 青草视频在线播放 | 日韩午夜片| a级免费网站 | 亚洲精品美女在线观看 | 奇米狠狠去啦 | 五月天激情视频 | 日韩av免费网址 | 午夜一区二区三区免费 | 成人国产精品免费观看 | 夜夜高潮夜夜爽国产伦精品 | 日本少妇xxxxx | 九色视频网 | 国产av自拍一区 | 欧美日韩国产传媒 | 日韩av大全| 日日夜夜草 | 日本高清视频免费看 | 青青在线视频 | 国产靠逼视频 | 男生尿隔着内裤呲出来视频 | 亚洲人成人无码网www国产 | 91丨九色丨海角社区 | 中文在线а√在线8 | 999精品免费视频 | 调教在线观看 | 亚洲乱强伦 | 天天想你在线观看完整版高清 | 九色在线观看 | 欧美jizz欧美性大全 | 一区三区在线观看 | 山外人精品影院 | 操女网站 | 丰满大乳露双乳呻吟 | 欧美1314 | 黄色在线免费 | 麻豆91av | 免费黄色欧美 | 中国老太婆性做爰 | 国产日韩久久久 | 久久精品视频7 | 色综合一区二区 | 日韩精品v| 日韩一及片 | 欧美在线日韩 | 99久久久成人国产精品 | 成人中文字幕+乱码+中文字幕 | av日日夜夜 | 五月丁香久久婷婷 | 久久99免费| 日本免费一区二区三区四区五六区 | 久久久无码精品亚洲国产 | 毛片av网站 | 日本精品在线观看视频 | 亚洲婷婷av| 亚洲国产一区二区三区四区 | 麻豆福利视频 | 尤物视频在线观看免费 | 完美搭档在线观看 |