RAZ-400KW intermediate frequency power supply---+---furnace shelf (combination)

  • Description

Induction Heating Power Supply--Safety Operation Guide


1. Before starting the machine, first check whether the water, gas and electricity are connected. After connecting, the following operations can be performed;

2. The operator must prepare corresponding insulating shoes, gloves, etc.

3. The operator must have the corresponding electrical knowledge.

4. Before the equipment is overhauled, the electric switch must be pulled off to confirm that the power supply is disconnected, and then the discharge treatment is carried out, and then the overhaul card is hung up, and the overhaul is repeated.

5. Before starting the machine, first make sure that the waterway is normal and all parts of the equipment are normal before starting the machine.

6. Turn on the first gear filament first, then turn on the second gear filament after five minutes, and then send the high voltage after another five minutes.

7. Before sending high voltage, make sure that the output adjustment potentiometer is in a small position, and then send high voltage, and adjust the output voltage to the working voltage.

8. After confirming that there is a workpiece, you can press the heating button to make the equipment work, but no-load heating is not allowed.

9. If there is an abnormality in the equipment during work, the power supply must be disconnected immediately, and the reason should be checked before working again.

10. After the equipment is finished working, first disconnect the heating, then disconnect the high voltage, then turn off the filament and disconnect the power supply.

11. After the equipment stops working, wait for five minutes before disconnecting the water source.

12. During the operation of the equipment, if there is a temporary need to leave, it must be done. People leave the machine and stop it. It is not allowed. The machine is still working when there is no one.


weekly maintenance

1. When taking over the shift, check the flow of the cooling water outlet pipe of the equipment for abnormal phenomena. For equipment that uses evaporative cooling tubes, it is necessary to check whether the water level of the distilled water tank is qualified;

2. When taking over, check whether the cooling air volume of the glass shell and core column of the electronic tube and other ventilation and heat dissipation facilities are normal;

3. Check whether the contacts of each AC contactor are ablated and whether the wiring is loose;

4. Measure the insulation resistance of cooling water. The ground resistance of the anode of the water-cooled tube should be greater than 300K ohms;

5. The cooling water pipes of the electronic tube grid and the filament are mostly rubber tubes, which are easy to age and should be carefully checked. For the rubber tube that is aging and about to break, it should be updated in time;

6. Do a cleaning and dust removal on the inside of the chassis, wipe off the dust of each high-pressure porcelain bottle and insulating pillars, and pay attention to the cleaning of the dust filter on the air inlet of the fan. Prevent the air intake from being blocked and reduce the air output.


Semi-annual maintenance

1. Check whether the insulation performance of the low-voltage electric control circuit is qualified;

2. Use a megohmmeter to detect the insulation resistance of high-voltage devices such as high-voltage rectifier transformers, high-voltage cables, and high-voltage silicon stacks, and the value should meet the requirements;

3. Check the roundness of the inner tube of the water jacket of the electronic tube and the height of the positioning protrusion, so as to prevent the partial overheating of the anode caused by the deviation of the tube. And check whether there is scaling at the water jacket outlet and inlet pipe joints, and whether the anti-corrosion electrode is normal; 4. Check the set current value of each overcurrent relay;

5. For connecting conductors with high temperature during operation, such as filament lead wires, soft connecting wires for welding transformer primary coils, etc., if there is poor oxidation contact, additional treatment should be made;

7. Thoroughly clean the hidden places such as the top of the cabinet and the cable trench.


Link to this article:http://m.mortgage-hk.com/en/product/product20181026142.html
Previous:NO!
Next:NO!

Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 色婷婷av一区二区三 | 国产不卡在线视频 | 成年性生交大片免费看 | 婷婷在线观看视频 | 日韩综合网站 | 99热热久久 | 岛国av免费 | 秋霞av一区二区三区 | 超碰人人澡 | 久色视频在线观看 | 日日操夜夜干 | 久草麻豆 | 精品少妇一区二区 | 人人搞人人插 | 视频一区中文字幕 | 国产又粗又猛又色 | 国产又大又粗又硬 | 亚洲精品视频免费在线观看 | 亚洲视频456 | 亚洲无人区码一码二码三码的含义 | 爱爱免费网址 | 看免费毛片| 日本女优网址 | 日韩精品一区二区三区四区 | 久久久久一区二区三区四区 | 亚洲九九热 | 欧美xxxx中国 | 性高跟丝袜xxxxhd | 亚洲国产日韩精品 | 男女视频久久 | av国产一区 | 日本在线二区 | 中文字幕在线视频播放 | 日韩欧美久久 | 青青草污 | 亚洲午夜一区二区三区 | 河北彩花av在线播放 | 日本国产一区 | 99精品福利 | 片多多在线观看 | 日本精品一二三 | 国产精品不卡一区二区三区 | 在线播放av网站 | 五月网 | 国产femdom调教7777 | 国产乱子一区二区 | 超碰网站在线 | 亚洲福利小视频 | 亚洲一区成人 | 免费草逼网站 | 中文字幕免费高清网站 | 另类图片亚洲色图 | 欧美成人黑人xx视频免费观看 | 欧美精品国产动漫 | 精品xxxx | xxx在线播放 | 无码人妻精品一区二区三区温州 | 亚洲国产一区二区三区四区 | 黄色日本视频 | 亚洲av激情无码专区在线播放 | 一级做a爱片 | 国产人妻久久精品一区二区三区 | 久久高清无码视频 | 美国少妇性做爰 | 国产富婆一级全黄大片 | 七七久久| 6080福利 | 麻豆综合 | 久久五| 综合激情婷婷 | 欧美精品久久久久久久久老牛影院 | 无码国产精品高潮久久99 | 欧美成人日韩 | 国产精品无码在线 | 亚洲成人精品久久 | 中文字幕资源在线 | 伊人精品在线观看 | 国产综合一区二区 | 久久精品国产清自在天天线 | 久久丫精品久久丫 | 欧美一级少妇 | 亚洲av永久无码国产精品久久 | 伊人色在线| 国产成人在线视频免费观看 | 综合中文字幕 | 天堂最新 | 清纯唯美第一页 | 韩国黄色片网站 | 少妇高潮一区二区三区喷水 | 欧美一级爱爱 | 私密按摩massagexxx | 狠狠的色 | 亚洲热热 | 性爱免费在线视频 | 久久高清内射无套 | 少女情窦初开的第4集在线观看 | 国精品人妻无码一区二区三区喝尿 | 日日干日日插 | 四虎库 |